Project Photos
Progress photos are displayed by date with the most recent on top.
Please click on the photo to enlarge the image.
July 21, 2016
- Netting to protect wetland plantings
- Aggregate base for Washington Street
July 12, 2016
- East retaining wall temporary sheet piling
- Wetland plantings
- Pump station electrical components
July 7, 2016
- Wetland plantings
- East retaining wall temporary sheet pile installation
- Pump station precast detailing
June 30, 2016
- Completed north abutment backfilling
- Pump station internal coating application
- South abutment sheeting removal
June 21, 2016
- Stain pump house precast sample
- Pump station precast control house
- Backfill behind north abutment and wingwall
- Temporary abutment sheeting removal
June 16, 2016
- Backfilling in front of the west retaining wall
- Completed storm sewer behind west retaining wall
- Abutment sheeting extraction
June 8, 2016
- Site looking west from railroad tracks
- Preparation for east retaining wall sheeting installation
- Storm sewer installation behind the west retaining wall
- Abutment sheeting removal
June 1, 2016
- West retaining wall sheeting extraction and backfilling
- North abutment drainage system installation
- Final west retaining wall panel
May 24, 2016
- Basin along Haryan Way
- West retaining wall drainage installation and backfilling
- West retaining wall sheeting extraction
- Final west retaining wall installation
May 17, 2016
- West retaining wall backfilling
- Basin 2 seeding and erosion control blanket installation
- West retaining wall final panel footing construction
May 10, 2016
- West retaining wall backfilling
- North abutment west wing wall construction
- Retention pond at Haryan Way reshaphing
- South abutment stem completion
- North abutment drainage system construction
May 3, 2016
- North abutment stem completion
- West wing wall under construction
- South abutment stem completion
- West retaining wall construction
April 28, 2016
- North abutment stem construction
- West retaining wall construction
- South abutment stem construction
- West retaining wall construction
April 21, 2016
- North abutment pile cap
- South abutment stem rebar installation
- West retaining wall installation
April 14, 2016
- North abutment pile cap construction
- West retaining wall construction
- South abutment stem construction
- South abutment stem construction
April 7, 2016
- North abutment completed pile installation
- Ongoing west retaining wall construction
- South abutment completed pile cap
- Storm water structure installation
March 29, 2016
- North abutment piles
- West retaining wall rebar
- South abutment pile cap rebar and formwork
- West retaining wall panel
March 23, 2016
- North abutment prepped pile installation
- Completed west retaining wall panel
- South abutment completed pile installation
March 17, 2016
- North abutment excavation
- West retaining wall construction
- South abutment excavation
March 9, 2016
- West retaining wall construction
- North abutment excavation
- Retaining wall “mock-up”
- South abutment excavation
March 2, 2016
- North abutment excavation and bracing
- West retaining wall construction
- South Abutment test pile
- West retaining wall excavation and pile layout
February 25, 2016
- North abutment excavation and bracing
- North abutment test pile and excavation
- West retaining wall excavation and pile layout
- West retaining wall construction
February 19, 2016
- North abutment excavation
- West retaining wall footing installation
- South abutment completed excavation and pile layout
- West retaining wall completed footing
February 9, 2016
- North abutment completed sheet piling
- West Retaining wall construction
- South abutment excavation
- West Retaining wall construction
February 2, 2016
- North abutment sheet piling
- West retaining wall concrete work
- South abutment excavation
January 19, 2016
- Pump station piping
- South bridge abutment sheet pile installation
- Temporary railroad shoofly looking north
January 13, 2016
- South bridge abutment sheet pile installation
- West retaining wall
- Temporary railroad shoofly
January 7, 2016
- Pump station mechanical work
- West retaining wall
December 23, 2015
- Installed H-piles west retaining wall
- Railroad shoofly looking south
- Railroad shoofly looking north
December 15, 2015
- Completed temporary west retaining wall sheet pile
- Completed temporary Metra platform
- First train on temporary shoofly
December 10, 2015
- Retaining wall temporary sheet pile installation
- Paved temporary Metra platform
December 3, 2015
- Temporary Metra platform
- Retaining wall temporary sheet pile installation
- Pump station slab
November 25, 2015
- Retaining wall temporary sheet piling installation
- Temporary Metra platform
November 17, 2015
- Railroad shoofly north of roadway runaround
- Washington Street excavation west of tracks
- Temporary Metra platform
November 10, 2015
- Construction of Temporary Metra Platform
- Washington St. Excavation west of the tracks
- RR shoofly south of roadway runaround
- RR shoofly north of roadway runaround
- Pump Station Construction
November 3, 2015
- Railroad shoofly north of roadway runaround
- Railroad shoofly south of roadway runaround
- Washington Street excavation west of tracks
October 27, 2015
- Railroad shoofly north of roadway runaround
- Washington Street excavation west of tracks
- Railroad shoofly south of roadway runaround
- Pump station
October 20, 2015
- Railroad shoofly track north of roadway runaround
- Washington Street excavation west of the tracks
- Railroad shoofly south of Washington St. prior to track placement
October 14, 2015
- Shoofly north of runaround
- Shoofly south of Washington Street
- Pump station
- Washington Street excavation west of tracks
October 7, 2015
- New signals and gate crossing
- Roadway runaround and temporary pedestrian path
- South shoofly temporary earth retention system
- South shoofly embankment
- Pump station
September 29, 2015
- Roadway runaround looking east
- Roadway runaround looking west
- Pump station construction
- Railroad sign installation
September 24, 2015
- Roadway runaround looking west
- Roadway runaround looking east
- Pump station
September 15, 2015
- Roadway runaround looking east
- Pump station
- Roadway runaround looking west
September 9, 2015
- Asphalt paving of the roadway runaround
- Railroad shoofly looking north
- Pump station preparation of the intermediate slab
September 4, 2015
- Completed detention basin
- Paved roadway runaround
- Pump station intermediate slab form work
- Restored bike path
August 26, 2015
- Roadway runaround at track looking west
- East end of roadway runaround
- Detention basin construction
- Pump station foundation walls
August 19, 2015
- Roadway runaround looking west
- Roadway runaround looking east
- Roadway runaround – East end
- Pump station foundation
August 11, 2015
- Pump station foundation
- Track shoofly at roadway runaround
- Railroad shoofly south of Washington Street
- West end of roadway runaround looking east
August 4, 2015
- Roadway runaround west of tracks
- Roadway runaround east of tracks
- Detention basin excavation
- Pump station excavationi
- Railroad shoofly
July 28, 2015
- Washington Street pavement
- CLCJAWA water main connection
- Lowlands Drive roadway runaround
July 21, 2015
- Drying and placing shoofly material
- Pump station excavation
- Drying and placing roadway runaround material
July 14, 2015
- Pavement reconstruction
- Pump station temporary sheeting
- Railroad shoofly grading
July 7, 2015
- Detention basin excavation
- Project site west of tracks
- Pump station excavation
June 30, 2015
- Project site west of tracks
- Excavation along tracks south of Washington Street
- CLCJAWA water main installation
June 23, 2015
- Excavation along the CN tracks looking north
- Removing unsuitable material along the tracks
- Excavation along the CN tracks looking south
June 16, 2015
- Looking south along CN tracks
- Looking north along CN tracks
June 9, 2015
- Site west of CN tracks
- Installing casing pipe
- Silt fence around detention basin
June 2, 2015
- Site between Lowlands Drive and tracks
- Site west of Lowlands Drive
- Sanitary sewer installation
May 26, 2015
- Overall site east of tracks
- Tree clearing operation
May 20, 2015
- Overall site
- Sanitary casing beneath tracks
May 12, 2015
Overall site photos
May 5, 2015
Overall site photos
April 30, 2015
- Overall site east of tracks
- Overall site west of tracks
April 21, 2015
Overall site photos
April 7, 2015
Overall site photos
March 31, 2015
- Overall site
- Looking west
- Water main
March 24, 2015
- Project work site
- Project work site
- Water main bore pit
March 17, 2015
- Trench box
- Trench compaction
- Work area
March 11, 2015
- LCPW sanitary sewer trench in progress
- Topsoil stock pile.
- Washington/Lake looking west.
March 3, 2015
- Trench for sanitary sewer
- Silt fence
- Excavation
February 13, 2015
- Silt fence
- Silt fence