Construction Update 9-6-2017

Restoration continues with seeding and blankets being installed throughout the project limits. The final portion of Lowlands Drive has begun to be installed with final paving scheduled for next week. The balance of the median west of Haryan Way is also scheduled to be completed next week. The tie in pieces of curb and gutter has been poured with their associated sidewalk schedule to be constructed next week. The asphalt resurfacing of Washington Street through the intersection of Lake Street is also scheduled for next week. The driveway for the pump station has been completed.

The work being completed along the northeast corner of Lake and Washington Streets is under a separate contract not affiliated with this grade separation project.

The work being completed along the northeast corner of Lake and Washington Streets is under a separate contract not affiliated with this grade separation project.

Work Zone Cameras can be viewed under the Photos Tab on the website.

Construction Update 8-25-2017

The roadway runaround has been removed and restoration is in progress. Installation of the final portion of Lowlands Drive has started. Paving is scheduled to begin next week. Construction of the median west of Haryan Way has started with the curb and gutter to be done this week. The balance of the median is scheduled to be completed next week. The tie in pieces of curb and gutter have been poured. The sidewalk is schedule for next week. Topsoil placement throughout the project continues. The driveway for the pump station is scheduled to be constructed next week.

The work being completed along the northeast corner of Lake and Washington Streets is under a separate contract not affiliated with this grade separation project.

Work Zone Cameras can be viewed under the Photos Tab on the website.

Construction Update 8-18-2017

All four lanes of Washington Street are open. Removal of the roadway runaround has started. The final portion of Lowlands Drive is being installed. The median west of Haryan Way has been excavated and is scheduled to be installed next week. Topsoil placement will continue and excavation of the tie in pieces of curb and sidewalk will start soon. The driveway for the pump station is scheduled to be installed next week.

The work being completed along the northeast corner of Lake and Washington Streets is under a separate contract not affiliated with this project.

Work Zone Cameras can be viewed under the Photos Tab on the website.

Construction Update 8-14-2017

All four lanes of Washington Street are open. The sidewalk along the north side and the bike path along the south side of Washington Street are almost complete. Staining of the walls is complete. The roadway runaround will now be removed, topsoil will continue to be placed, and the tie in pieces of curb and sidewalk will begin to be excavated. The final portion of Lowlands Drive will begin to be installed as well as the proposed median west of Haryan Way. Installation of the pedestrian signals at the intersection of Lake and Washington Streets continues.

Work Zone Cameras can be viewed under the Photos Tab on the website.

Construction Update 8-2-2017

The concrete curb and gutter as well as the medians have virtually been completed. The concrete sidewalk along the north side of Washington Street has been substantially completed. Grading for the asphalt bike path along the south side continues with the paving scheduled for next week. Final grading with topsoil placement along the north side slope east of the tracks is underway. The ornamental fence atop the north abutment is scheduled to be installed this Saturday, August 5th. Staining of the retaining walls and abutments has started and will continue into next week. The final striping along Washington Street will begin next week. Installation of the pedestrian signals at the intersection of Lake and Washington Streets has begun.

Work Zone Cameras can be viewed under the Photos Tab on the website.