Construction Update 8-2-2017

The concrete curb and gutter as well as the medians have virtually been completed. The concrete sidewalk along the north side of Washington Street has been substantially completed. Grading for the asphalt bike path along the south side continues with the paving scheduled for next week. Final grading with topsoil placement along the north side slope east of the tracks is underway. The ornamental fence atop the north abutment is scheduled to be installed this Saturday, August 5th. Staining of the retaining walls and abutments has started and will continue into next week. The final striping along Washington Street will begin next week. Installation of the pedestrian signals at the intersection of Lake and Washington Streets has begun.