Construction Update 8-14-2017

All four lanes of Washington Street are open. The sidewalk along the north side and the bike path along the south side of Washington Street are almost complete. Staining of the walls is complete. The roadway runaround will now be removed, topsoil will continue to be placed, and the tie in pieces of curb and sidewalk will begin to be excavated. The final portion of Lowlands Drive will begin to be installed as well as the proposed median west of Haryan Way. Installation of the pedestrian signals at the intersection of Lake and Washington Streets continues.

Work Zone Cameras can be viewed under the Photos Tab on the website.