Construction Update 11-01-2016

The retaining wall east of the railroad bridge continues to be worked. The remainder of the footings have been poured and the walls are being framed and prepared. The completed portion of the east retaining wall continues to be backfilled. Temporary soil retention system continues to be installed near the north side of the bridge, and braced excavation is occurring in preparation for extending the north abutment. The precast pump station house continues to be detailed. The electrical and mechanical components of the pump station continue to be installed.

Work Zone Cameras can be viewed under the Photos Tab on the website.