Construction Update 08-04-2016

The erection of the bridge structural steel is scheduled to begin Monday August 15th. The installation of the piles for the east retaining wall will be on hold until the structural steel has been erected and the train traffic is switched back to its original alignment. Meanwhile the footings for the east retaining wall continue to be formed and poured with the retaining wall panels to follow. The precast pump station house continues to be detailed. Installation continues on the electrical and mechanical components of the pump station. Maintenance on the wetland plants installed in the basin at the northwest quadrant of Washington Street and Lake Street is ongoing.

Work Zone Cameras can be viewed under the Photos Tab on the website.