The test pile for the north abutment has been driven and production pile installation is expected to follow in the coming weeks. The north abutment excavation is ongoing along with the associated bracing. The contractor continues forming and pouring the concrete for the west retaining wall on the west side of Washington Street. The contractor continues to excavate for the west retaining wall with production pile driving following directly behind. Other ongoing construction activities include the installation of the mechanical elements of the pump station.
- North abutment excavation and bracing
- North abutment test pile and excavation
- West retaining wall excavation and pile layout
- West retaining wall construction